Foreign projects

Brookfield place (Wynyard)

Word:[Big][Middle][Small] QR Code 2022/11/9     Viewed:    


▪ It is the western corridor connecting Wynyard Station with the Sydney CBD and consists of a series of up and down pedestrian links, including a 9m pedestrian tunnel, bridge, plaza and new urban building connecting Wynyard Station


▪ Our company participated in the production of brass plate (antique finish treatment), aluminum grating supply (production, anodizing), steel structure supply (production, painting), aluminum plate production (metal modeling, PVDF coating), stainless steel plate production (No.4 brushed finish treatment), stainless steel accessories supply (casting production).


A large number of oversized special-shaped parts (length 580M, width 1.2m, height 2.3m) have been coated with PVDF, which all meet the Australian AS3715-1989 coating standard.


The production accuracy of steel structures reaches Australian standards ASNS-3678, The paint conforms to the Australian C4 environment standard.

The color of the antique finish is uniform, color difference in line with international standards, high flatness, high color firmness.


High precision casting products, short delivery time.


Go Back
Print
0086-18616555820
Browse mobile station
Wechat QR code
brilliant@bolinsupply.com